Of course, we warmly welcome your visit:
– Fully arranged visits (flights, hotels, local transport).
– Go deep into our factory and understand our real situation.
– Meet the production team and quality control experts.
Yes. We supply Critical Heating Cycle Service:
– Customized ramp-up schedules (5°C/hr to 350°C/hr)
– MWDA (Moisture Weight Loss Differential Analysis)
– 24/7 remote monitoring during curing phases
KERUI Academy Certification Courses:
– Level 1: Basic refractory installation
– Level 2: Advanced repair techniques
– Level 3: Failure analysis & preventive maintenance planning
Full Traceability Package:
– Mill test certificates with heat numbers
– XRF chemical analysis reports
– Non-destructive testing (UT) records for monolithic refractories
– Country-specific customs clearance support
Yes, we offer pre-built and modular installation guidance for special kilns
– Pre-cured panels with interlocking edges
– Integrated anchor channels and expansion allowances
– Reduces installation time by 40% vs traditional methods
Our CNC machining capabilities:
– Tolerance: ±0.5mm for critical dimensions (ISO 286-2)
– Complex geometries: Arch segments, burner blocks, throat assemblies
– Rapid prototyping: 3D-printed test units available in 72hrs
Our certified technicians offer global commissioning support. Training videos and multilingual manuals included with all orders.
Foam-wrapped bricks in moisture-proof double-wall boxes.
• Boxes taped, edge-guarded; stacked on ISO-certified pallets (1.5T max).
• Secured with steel strapping, labeled Fragile/Dry + QR codes.
• Sea/air-ready; custom pallet sizes optional.
– FOB/CIF by sea (20GP/40HQ containers)
– Air freight for urgent orders (<500kg)
– Land transport via China-Europe Railway Express , etc.
We have more than 20 index tests and testing equipment. We conduct simulated service tests in our industrial-scale pilot kiln, replicating client-specific thermal cycling and atmosphere conditions.
Our 12-step QC process includes:
– Raw material XRF analysis.
– Semi-finished product density/porosity tests.
– Final inspection: appearance inspection, chemical index testing, cold crushing strength, thermal shock resistance (ISO 3187).
– Batch-wise sample archiving (retained for 5 years).